Implementing the Drinking Water Directive: water quality and access to it improved in Bulgaria, Hungary and Romania, but investment needs remain substantial
About the report: This report examines whether EU actions improved the quality of drinking water in Bulgaria, Hungary and Romania as required by the 1998 Drinking Water Directive.
Overall, we conclude that the situation has improved significantly. Nevertheless, there are still areas where citizens are supplied with water from the public supply network that is not fully in compliance with EU standards. Moreover, significant further national public and private funding will be needed to ensure access to good quality water to all citizens in these Member States and to ensure that EU-funded investments in water facilities can be adequately maintained.
Among other things, we recommend that several remaining issues are addressed in the context of the current revision of the Drinking Water Directive and that the sustainability of water infrastructure is ensured while safeguarding the affordability of the service.
Executive summary
The Drinking Water Directive
IWater is essential for life on our planet. Our ecosystems, society and economy all need clean fresh water in sufficient amounts to thrive. The protection of EU citizens’ health through safe access to quality drinking water has been an element of EU policy for many years. Since 1975, the EU has adopted legislation on water that aims to protect consumers and water users, against harmful effects. A directive concerning standards for water intended for human consumption, the ‘Drinking Water Directive’ (DWD), was adopted in 1980 and subsequently revised in 1998. This directive is currently under revision.
How we conducted our audit
IIOur audit assessed whether EU actions improved the safe access of citizens to quality drinking water in Bulgaria, Hungary and Romania. In particular, we examined whether the requirements of the Drinking Water Directive have been met; the examined ERDF/CF-funded projects improved the quality of drinking water and the access to its supply; and the revenues generated and the additional national public funding are adequate to ensure the maintenance and sustainability of the EU-funded investments in drinking water supply infrastructure.
IIIThe ERDF/CF funds for the management and supply of drinking water between 2007 and 2020 in these three Member States is 3.7 billion euro. The audit covered the period from the accession of the visited Member States to the EU until the end of 2016.
What we found
IVOverall, we conclude that the citizens access to and supply of quality drinking water in Bulgaria, Hungary and Romania has improved. This is to a large extent due to the significant ERDF and CF-funded investments made in recent years. Nevertheless, there are still areas where citizens are supplied with water from the public supply network that is not fully in compliance with the EU standards set out in the 1998 Drinking Water Directive. Moreover, significant further national public and private investments are needed to ensure access to good quality water to all citizens in these Member States and to ensure that EU-funded investments in water facilities can be adequately maintained.
What we recommend
VThe Commission should:
- follow-up gaps in Member States’ monitoring based on existing reporting and enforce the requirements of the Drinking Water Directive in this respect;
- in the context of the current revision of the Drinking Water Directive, address the following issues in a proportionate manner:
- improving the provision of information from Member States to the Commission about derogations concerning Small Water Supply Zones;
- the extension of the reporting requirements to Small Water Supply Zones;
- regular reporting ensuring that up-to-date information on the compliance with the Drinking Water Directive is collected from Member States. The Commission should consider options such as alternative IT tools (e.g. data harvesting from national administrations) to facilitate the reporting exercise, make it swifter and to ensure availability of up-to-date information;
- improving the requirements for the provision of adequate and up-to-date information on the quality of water intended for human consumption available to consumers;
- support Member States in promoting actions aiming at the reduction of water losses. This could be achieved, for example, by including water loss reduction in the scope of EU funding in the field of drinking water infrastructure, or by enhancing transparency on water losses.
Member States should:
- require that plans to reach a certain level of reduction of water losses are included as selection criteria for all water facility projects that allow the meeting of national targets;
- ensure that water tariffs provide for the sustainability of water infrastructure, including its maintenance and renewal;
- consider, if necessary, granting financial or other forms of support to households for which the cost of water services are above the affordability rate while ensuring the full cost-recovery in the water tariffs structure.
Introduction
The EU Drinking Water directive
01Water is essential for life on our planet. Our ecosystems, society and economy all need clean fresh water in sufficient amounts to thrive. The protection of EU citizens’ health through safe access to quality drinking water has been an element of EU policy for many years. Since 1975, the EU has adopted legislation on water that aims to protect consumers and water users, against harmful effects. Ensuring high quality and safe supply to all Europeans is also an integral part of the EU’s environmental policy1.
02A first directive, on the quality of drinking water in the Member States was adopted in 19752. A further directive concerning standards for water intended for human consumption, is the ‘Drinking Water Directive’ (DWD), which aims at protecting human health from the adverse effects of any contamination of water intended for human consumption (see Box 1). It was adopted in 19803 and subsequently revised in 19984. This directive is currently under revision.
Box 1
The Drinking Water Directive
The DWD lays down quality standards for drinking water in the EU for 48 parameters which must be monitored and tested regularly by the Member States. The parameters are broken down into three categories:
- microbiological parameters (relevant for human health) which comprise mainly the parameters E. coli and enterococci;
- chemical parameters (relevant for human health) which range from specific substances such as individual metals, individual organic compounds to generic substances such as pesticides and disinfection by-products;
- indicator parameters, providing information on treatment processes and the organoleptic (i.e. colour, odour, and feel of a substance) and aesthetic quality of drinking water, which are a mixture of microbiological, chemical and radiological parameters. A failure to meet an indicator parameter is a signal that there may be a problem with the supply that needs investigation and consideration as to whether or not human health is at risk.
The Directive provides for the possibility for Member States to temporarily depart from the required water quality standards by means of derogation. These derogations may last up to three years and may be extended twice (an additional three years for every extension).
Monitoring and reporting arrangements
04Member States have an obligation to establish water supply zones and appropriate monitoring programmes in accordance with the minimum requirements set in the DWD5. The DWD distinguishes between:
- water supply zones supplying more than 1 000 m3 of water a day as an average or serving more than 5 000 persons, commonly referred to as ‘large water supply zones’ (LWSZ),
- water supply zones supplying less than 1 000 m3 of water a day as an average or serving less than 5 000 persons, commonly referred to as ‘small water supply zones’ (SWSZ), and
- water supply zones providing less than 10 m³ of water a day as an average or serving fewer than 50 persons, commonly referred to as ‘very small water supply zones’.
In addition, the DWD requires that up-to-date information is available to consumers6 and that Member States publish a report on the quality of water intended for human consumption every three years, covering the three years that have passed. These reports should be published within one calendar year of the end of the reporting period and should be sent to the Commission within two months of their publication.
06The European Environment Agency (EEA) collects the data on the quality of water from Member States on behalf of the Commission via an online reporting tool7. The EEA is also responsible for the quality check of the information in the database and prepares national databases, which are verified by the Member States. Based on this data, the Commission publishes a synthesis report on the quality of water intended for human consumption in the Union as a whole within nine months of receiving the Member States’ reports.
07In this report, which is the main tool to detect non-compliance with the parametric values laid down in the DWD, each Member State should report on the quality of water in all LWSZ. Reporting on SWSZ is voluntary. Member States may exempt from the provisions of the DWD very small water supply zones, i.e. individual supplies providing less than 10 m³ of water a day as an average or serving fewer than 50 persons.
The quality of drinking water in the EU
08As part of the requirement of the DWD to assess drinking water quality, several million analyses are carried out annually across the Member States. For example, during the 2011-2013 reporting period, 4.1 million analyses were carried out on microbiological parameters, 7.1 million on chemical parameters and 17.5 million on indicator parameters (see Box 1). If at least 99 % of all analyses done in a given year meet the given standard, the Member State is considered to be compliant with the parametric value laid down in the DWD.
09In the case of indicator parameters, the fact that a standard is exceeded does not necessarily mean a non-compliance with the DWD because in most cases there is no direct threat to human health. Even though most indicator parameters do not pose a direct threat to human health, they might impact indirectly on water quality through the appearance, taste or odour of the water and hence influence the acceptability to the consumer. For example, the threshold set in the DWD for iron is 200 μg/l. With Iron concentration of 300 μg/l, water has a noticeable taste and becomes turbid and coloured. Consequently, this result is distasteful to consumers. The health-based value is 2 000 μg/l, therefore much higher than what is actually acceptable to consumers. Indicator parameters might also interfere with proper treatment. For example, the presence of organic matter might result in inadequate disinfection.
10In general, drinking water quality in the EU is good8. In particular, the vast majority of large water supply zones (LWSZ) show high compliance with the microbiological and chemical parameters set in the DWD (see details in Table 1). In addition, the overall compliance in the EU improved significantly compared to the 2008-2010 reporting period9.
2008-2010 | 2011-2013 | |
---|---|---|
Overall compliance rate of Microbiological parameters | ||
> 99 % | 23 | 27 |
95 % < X < 99 % | 4 | - |
< 95 % | - | - |
Overall compliance rate of Chemical parameters | ||
> 99 % | 11 | 26 |
95 % < X < 99 % | 11 | 12 |
< 95 % | 5 | - |
Overall compliance rate of Indicator parameters | ||
> 99 % | 7 | 21 |
95 % < X < 99 % | 10 | 53 |
< 95 % | 10 | 14 |
1Croatia, having joined the EU on 1 July 2013, was exempted from the 2011-2013 reporting process.
2Hungary.
3Denmark, Cyprus, Latvia, Hungary and Slovenia.
4For indicator parameters, Malta reported a compliance rate of around 90 % because of very low compliance rates on chloride.
Source: ECA elaboration based on data published in Synthesis Reports on the Quality of Drinking Water in the Union.
Concerning SWSZ (which serve about 65 million people in the EU as a whole), the average compliance rate for the 2011-2013 reporting period was above 98 %10. This overall figure indicates progress compared to the 2008-2010 reporting period when, on average, only around 59 % of all SWSZ were in full compliance with DWD requirements11. For the 2008-2010 period, all Member States, except the Czech Republic, reported on SWSZ. For the 2011-2013 reporting period, however, only about half of the Member States (representing about 34.6 million consumers served by SWSZ) provided information. This is due to the fact that the reporting for SWSZ is not compulsory.
12Shortcomings in the monitoring of SWSZs were also recognised in the 7th Environmental Action Programme (EAP), which called for increased efforts in the implementation of the DWD, in particular for SWSZ12.
Losses in drinking water supply systems
13An important issue affecting drinking water supply is the high rate of physical water loss. This is mainly due to leakages from distribution networks that have been poorly maintained or that need to be renewed. The percentage of water losses is calculated as the ratio between non-invoiced water and the total amount of water entering the supply network.
14According to data published in 2014 referring to the 2008-2010 period, in about half of the Member States, more than 20 % of clean drinking water was lost in the distribution network before it could reach consumers’ taps, while for some Member States the proportion was as high as 60 %13. For the 2011-2013 period, unlike for the previous period, neither the Synthesis Report nor the Member States’ reports provided any information concerning water losses.
15Reducing losses is important from an environmental perspective (resource savings) and fundamentally affects the performance of water utilities. The Europe 2020 strategy places a high focus on resource efficiency, and this implies increasing water resource efficiency with additional benefits of less energy use for treating and transporting water and reduced water bills and water losses14. Also the 7th Environmental Action Programme puts forward the need to increase efficiency by the renewal of infrastructures15.
EU funding mainly through ERDF and CF
16The main source of EU funding for water infrastructures are the European Structural and Investment Funds (ESIF). In particular, projects have been financed through the European Regional Development Fund (ERDF) and the Cohesion Fund (CF).
17Many projects involving drinking water are carried out jointly with waste water projects16. During the 2007-2013 programme period, more than 7.3 billion euro was allocated to projects involving drinking water. Out of this, about 4 billion euro was dedicated to the EU13 Member States. For the 2014-2020 programme period, the total allocation to drinking water is about 4.7 billion euro, out of which about 3.4 billion euro is earmarked for the EU13 Member States (see Annex I).
Access to drinking water
18The availability of safe drinking water throughout the EU is high. However, there are still regions that do not provide citizens with access to water supply services. According to Eurostat data17, the rate of population connected to public water supply differs significantly among Member States. Romania has the lowest rate with just 62 % of the population connected to the public water supply (see Figure 1). Annex II provides background information on the sources of drinking water in the EU.
In December 2013, the EU citizens’ initiative ‘Right2Water’ collected nearly 1.9 million signatures across all Member States. This initiative invited the Commission ‘[…] to propose legislation implementing the human right to water and sanitation, as recognized by the United Nations, and promoting the provision of water and sanitation as essential public services for all’18. In 2014, the Commission published its assessment of the support already provided by the EU for good quality drinking water and encouraged Member States to ensure access to a minimum water supply to all EU citizens19.
Water tariffs
20The principles to be applied in the setting of water tariffs, namely cost-recovery and affordability of water services, were set in the 2000 Water Framework Directive20. In practice, tariffs should at least cover operating and maintenance costs, as well as a significant part of the assets’ depreciation to be able to contribute to the sustainability of the water infrastructures.
21At the same time, water services must be socially affordable to customers. When determining the water tariff, Member States may take into consideration the social, environmental and economic effects in an effort to ensure that water services remain affordable. Commission guidance refers to 4 % of household income as a commonly accepted affordability ratio, i.e. the total water bill (drinking water and waste water) can represent 4 % of household income21.
Previous ECA audits and other recent studies on water policy
22In recent years, we have published several reports on water policy and EU investments in drinking and waste water infrastructure22. Annex II summarises their main conclusions.
23In May 2015, the European Parliamentary Research Service published a report concerning the DWD23.
Audit scope and approach
24Through this audit, we assessed whether EU actions improved the safe access of citizens to quality drinking water in Bulgaria, Hungary and Romania. In particular, we examined whether:
- the requirements of the Drinking Water Directive have been met;
- the examined ERDF/CF-funded projects improved the quality of drinking water and the access to its supply;
- the revenues generated and the additional national public funding are adequate to ensure the maintenance and sustainability of the EU-funded investments in drinking water supply infrastructure.
We decided to focus on the EU13 Member States because in 2010 we already published a Special report covering the theme of drinking water in the 2000-2006 programme period, which focused on the EU15 Member States24. The selected Member States had been chosen mainly because of the amount of EU funds allocated to them between 2007 and 2020 (3.7 billion euro) which represent about 50 % of the total EU allocations to the management and supply of drinking water for the EU13 Member States (see Annex I), the limited access to drinking water (in the case of Romania) and because of the high level of water losses reported during the 2008-2010 period.
26The audit was based on evidence provided by the Commission and the visited Member States. In particular, it was carried out through:
- interviews with representatives of the Directorate-General for Environment and the Directorate-General for Regional and urban policy;
- an analytical review of relevant EU and national documentation;
- interviews with representatives from the Ministry of Environment, Ministry of Health, Managing Authority, regulatory bodies, etc., of the selected Member States;
- visits and reviews of nine ERDF/CF projects (three in each of the three visited Member States), including project documentation such as applications, grant agreements, reports and other documents related to project implementation;
- interviews with water operators, project beneficiaries and managing authorities of the nine projects examined.
The ERDF/CF drinking water projects examined for this audit relate to all aspects of the infrastructure linked to the drinking water cycle. They encompass the creation or rehabilitation of catchments (see Picture 1), treatment plants (see Picture 2), storage and transmission through pipes (see Picture 3) and pumping stations. Each of the selected projects was among the 20 projects having received the highest EU co-financing during the 2007-2013 programme period in each Member State. They were chosen to illustrate key aspects of the fulfilment of the DWD objectives and issues of access, losses and quality.
The audit covered the period from the accession of the visited Member States to the EU until the end of 2016.
Observations
The 1998 Drinking Water Directive had been implemented in most respects by the end of 2016
29The European Union cannot achieve its policy goals if Member States do not apply EU law effectively on the ground. The Member States are responsible for accurately transposing directives into their national law within the timeframe required. In addition, they are also responsible for correctly applying and implementing the entire body of EU legislation25. The Commission has the responsibility for monitoring the Member States’ efforts and ensuring compliance with EU law, including the resort to formal legal procedures26.
30The main EU legislation concerning the quality of drinking water is the DWD. Accordingly, we assessed whether:
- the visited Member States correctly transposed the DWD into national legal frameworks and fulfilled its requirements;
- adequate drinking water is available for all consumers in the visited Member States;
- the monitoring arrangements provide information on the implementation of the DWD;
- updated information on the quality of drinking water is available to consumers;
- the Commission regularly reviews the scientific and technical aspects of the DWD.
National legislation in the Member States visited is in compliance with the requirements of the Drinking Water Directive
31The effective transposition of the DWD into national legislation is a necessary step to ensure that drinking water satisfies a common safety level across the EU. From the date of accession27, the Commission had to ensure that the national legislations complied with the provisions of EU framework laws, except in case of specific derogations granted in the accession treaties.
32The Commission carries out conformity studies by comparing the EU obligations with the text of the relevant articles of national legislations to assess their compliance with the requirements of EU Directives. This was done in 2004 for Hungary and in 2007 for Bulgaria and Romania.
33For the three Member States visited, the Commission identified that the national legislations did not comply in every respect with the DWD and therefore infringement procedures (see Box 2) were launched in 2008 against Hungary and in 2009 against Bulgaria and Romania28 (see Annex III).
Box 2
Infringement procedure
Where it detects a failure to comply with European Union law, the Commission may initiate a procedure for failure to fulfil an obligation provided for in Article 258 of the TFEU.
In the first stage of the procedure, the Commission sends the Member State a letter of formal notice inviting it to submit its observations within two months. This exchange of views is not normally publicised.
Where the observations submitted by the Member State fail to persuade the Commission to change its point of view or where the Member State fails to respond to the request, the Commission may issue a reasoned opinion, allowing the Member State an additional two-month period within which to comply. At this stage the Commission issues a press release informing the EU’s citizens of the purpose of the procedure.
If the Member State fails to conform with European Union law, the Commission can take the case to the Court of Justice, whose judgment is binding.
If the Member State fails to comply with the Court’s judgment, the Commission may, after sending a further letter of formal notice, bring the matter before the Court of Justice a second time, seeking the imposition of a lump sum or penalty payment under Article 260 of the TFEU.
As a result of infringement procedures, the three Member States amended their national legislation. Consequently, the cases were closed in 2009 for Hungary and in 2010 for Romania. For Bulgaria, because of the magnitude of the amendments, the Commission updated its conformity study in 2012 detecting further non-compliances, and therefore the infringement procedure was only closed in 2015. Our review showed that, overall, the national legislation in the three Member States visited currently complies with the requirements of the DWD.
Derogations from Drinking Water Directive granted in Hungary and Romania, but not in Bulgaria
35Member States may provide for derogations from the parametric values, up to a maximum value to be determined by them, provided that no derogation constitutes a potential danger to human health and if the supply of water intended for human consumption in the area concerned cannot otherwise be maintained by any other reasonable means (see Box 3).
Box 3
Derogations - Article 9 of the DWD
Any derogation granted either by the Member States or the Commission should specify:
- the grounds for the derogation;
- the parameter concerned, previous relevant monitoring results, and the maximum permissible value under the derogation;
- the geographical area, the quantity of water supplied each day, the population concerned and whether or not any relevant food-production undertaking would be affected;
- an appropriate monitoring scheme, with an increased monitoring frequency where necessary;
- a summary of the plan for the necessary remedial action, including a timetable for the work and an estimate of the cost and provisions for reviewing;
- the required duration of the derogation.
These derogations should be limited to as short a time as possible and can last for a maximum of three years. If after this first period, issues leading to the derogation are persistent, Member States can extend the derogation for an additional period of up to three years, informing the Commission. In exceptional circumstances, a Member State may ask the Commission for a third derogation for a further period not exceeding three years.
37Member States are required to inform the Commission within two months of any derogation concerning LWSZ. Derogations concerning SWSZ need only to be communicated as and from the second derogation.
38In Hungary, at the end of the third derogation, lasting until the end of 2012, almost 80 % of the water supply zones under derogation (289 out of 365) were still not compliant with the Directive. Eventually, the measures taken by the Hungarian authorities to improve the situation in the zones under derogation started to deliver. In April 2016 there were 66 out of 365 WSZ that did not comply with the DWD. In the meantime, given the missed deadline, the Commission launched an infringement procedure against Hungary in May 2016.
39Romania was also granted derogations in the accession treaty29, which lasted either until the end of 2010 or until the end of 2015. Since accession, Romania has notified the Commission of seven subsequent derogations (i.e. second derogation) with deadlines between 2014 and 2018. But, according to the Romanian Ministry of Health, at the end of 2015 there were still 335 water supply zones, supplying water to approximatively 762 000 people (about 3.8 % of the total population of Romania), where the quality standards had still not been completely achieved for some parameters. According to the Romanian authorities, further measures to ensure compliance with the DWD are planned in the 2014-2020 period through the operational programme ‘Large Infrastructures’, the National Rural Development Programme (NRDP) and the National Programme for Local Development.
40In Bulgaria, no derogations have been granted up to the time of this report. Nevertheless, according to the Bulgarian Ministry of Health, there are several areas of the country with compliance issues. The most serious ones are related to nitrate/nitrite and involve about 300 SWSZ. For about 150 of these, non-compliance is persistent and relates to agricultural practices30. As a consequence, it can be estimated that about 124 000 people, i.e. 1.7 % of the total population, is using drinking water which is not in full compliance with the requirements of the DWD.
41Whether covered by a derogation or not, all three Member States have consumers who still do not have access to drinking water of an adequate quality. Member States are taking mitigating actions but sometimes these are late, as in the case of Hungary. In Romania such actions are currently being implemented but it is too early to judge as to their effectiveness.
Shortcomings in the Drinking Water Directive monitoring arrangements
Some Member States are late in reporting monitoring data
42The three synthesis reports (see paragraphs 5 to 7) covering the years from 2002 to 2013 were published with an average delay of more than 17 months. Table 2 shows the due dates and the actual publication dates of the synthesis reports covering the years from 2002 to 2013.
Synthesis report | Date due | Date published | Delay |
---|---|---|---|
2002-2004 | November 2006 | December 2007 | 13 months |
2005-2007 | November 2009 | December 2011 | 25 months |
2008-2010 | November 2012 | June 2014 | 19 months |
2011-2013 | November 2015 | October 2016 | 11 months |
According to a study published in 201331, this was due to the complexity of the information to be provided by Member States (in terms of number of parameters and amount of detailed information) which led to incomplete and late contributions from Member States.
44For the 2011-2013 reporting period, the majority of the Member States provided their data within the required deadline (February 2015)32. However, two Member States (Greece and Italy) necessitated up to six additional months to deliver their data, and one Member State, Hungary, only finalised its reporting in April 2016, i.e. more than a year later than required.
Member States visited have not complied with all monitoring obligations
45The DWD allows the reduction or the removal of monitoring for certain parameters, especially indicator parameters. In general, a Member State may reduce the number of samples to be tested for certain parameters if:
- the results of samples tested during a period of at least two successive years are constant and significantly better than the limits, and
- no factor is likely to cause a deterioration of the quality of the water beyond the point where the sample is taken33.
With the transposition of the Commission Directive (EU) 2015/1787, Member States have the possibility of derogating from the parameters and sampling frequencies, provided that a risk assessment is performed34 (see paragraphs 61 to 63).
47The national legislations of the three Member States visited comply with the monitoring requirements of the DWD. However, we detected several non-compliances in the actual monitoring carried out. The tri-annual reporting provides the percentage of LWSZ that has been monitored for each parameter. In the 2011-2013 reporting, we noted that in all the three visited Member States, not all the parameters had been monitored in all the LWSZ, without any justifications or explanations about possible monitoring exceptions. For example, trace elements35 were reported to be monitored on average in 81 % of the LWSZ in Bulgaria and Hungary and in only 41 % of the LSWZ in Romania.
48This was also confirmed for some of the ERDF/CF projects examined where we noted that the monitoring was not carried out in accordance with the DWD. In particular, fewer parameters than required in the DWD were tested.
49In Bulgaria, the issue of insufficient monitoring is recognised by the national authorities. As mentioned in the Bulgarian National report on Environment for 2012, most of the water operators, for some parameters (such as benzo(a)pyrene, antimony, mercury and polycyclic aromatic hydrocarbons) do not comply with the monitoring requirement of the DWD in terms of volume and frequency36. In addition, not all the large water supply zones were monitored for all the parameters. The above-mentioned parameters were monitored on average in only 66 % of the LWSZ.
50Moreover, according to preliminary data for 2014 and 2015, some parameters such as chromium, iron and enterococci were not monitored in all the SWSZ: iron was monitored in about 90 % of the SWSZ and chromium and enterococci in about 80 % of the SWSZ. As the population served by SWSZ in Bulgaria is about 1.7 million37, this means that an estimated 330 000 people were served by SWSZ not tested for enterococci. At the same time, in the tested SWSZ the level of non-compliance was above 2 %.
51According to the Bulgarian authorities, there is a lack of sufficient laboratory capacity: full checks of the samples can only be made in six of 28 Regional Health Inspectorates’ laboratories and bromate can only be tested for in two of them. A procedure for improving the analysis capacity of Regional Health Inspectorates is ongoing under the 2014-2020 Operational Programme ‘Environment’.
EEA checks on Member State reporting on compliance did not detect inconsistencies
52The compliance monitoring data provided by Member States are verified by the EEA on behalf of the Commission. The desk verifications by the EEA do not include on-the-spot verifications and are therefore by definition limited in scope. There are also cases where plausibility checks could have allowed the EEA to detect inconsistencies in Member States’ reporting:
- inaccuracies concerning the total number of analysis (and the consequent frequency of exceedance) for the parameter ‘coliform’ in Romania (see Box 4), and
- an error concerning the parameter ‘nitrites’ in Bulgaria, which refers in reality to the parameter ‘nitrates’.
Box 4
Example of inconsistencies in Member States’ reporting on compliance with the DWD that could have been detected by the EEA
In the 2011-2013 reporting38:
- the total number of analyses reported for 2013 for the parameter coliform is 7 71739 and
- the frequency of exceedance for this parameter is around 15.5 %.
However, the Annual report on the quality of drinking water for 201340 specifies correctly that:
- the total number of analyses for the parameter coliform in 2013 was 67 475 and therefore
- the correct frequency of exceedance was around 1.8 %.
As the total number of analyses reported for the parameter coliform for 2011 and 2012 was respectively 65 871 and 71 877, and the reported number for 2013 was only about one tenth of these numbers, this error could have been easily detected.
Moreover, also for several other parameters such as iron, manganese and colony count, the number of analysis reported in the Results of the reporting 2011-2013, and therefore also the frequency of exceedance, are different from those published in the Annual report for 2013.
Information on the fulfilment of monitoring requirements for Small Water Supply Zones is lacking
53SWSZ provide drinking water to approximately 65 million people in the EU. Based on 2010 data, the Commission estimated that, in the EU as a whole, more than one third of SWSZ were not properly monitored or the drinking water supplied was not complying with all quality standards41. In 2010, for the three Member State visited, the percentage of SWSZ that were not properly monitored was high: 44 % in Romania, 60 % in Hungary and nearly 100 % in Bulgaria, as compared to the EU average of 27 %.
54For the 2011-2013 reporting period, about half of the Member States provided information on SWSZ and reported an overall (all parameters included) compliance above 98 %42. The Commission followed-up compliance in SWSZ through a survey during the summer of 2016. 21 Member States replied to the survey and confirmed an overall compliance for microbiological indicators of 98 %.
55However, according to the DWD, reporting on SWSZ is not mandatory. The Commission cannot check whether the monitoring takes place in accordance with the way it is reported and must assume that Member States report in good faith, in accordance with the principle for sincere cooperation43.
56Whether this is the case is however less clear and the Commission has taken a number of initiatives in recent years to incentivise Member States to properly monitor their SWSZ. In 2011, the Commission published a study concerning the implementation of a Risk Assessment for small water supplies44. Moreover, in 2014 the Commission issued a Guidance document including best practices for small supplies45. The outcomes of this guidance in terms of improved monitoring of SWSZ will only be visible once Member States send their data for the next reporting period (2014-2016), towards the beginning of 2018.
Information to consumers on the quality of drinking water is not easily accessible
57Member States are required to take the measures necessary to ensure that adequate and up-to-date information on the quality of water intended for human consumption is available to consumers46. In the three Member States visited, this requirement is correctly transposed in the national legislations.
58We noted however that the Commission did not publish any guidance to Member States on how to meet the requirements of the DWD in this respect. A 2016 evaluation study found that practices in making such information available to customers differ significantly between Member States and even between water suppliers within a single Member State47.
59For the ERDF/CF projects examined, we found that the consumers do not always have easy access to such information, unless requested by the citizens themselves or in cases of accidents to the water network. In Hungary, information available to consumers in 2017 dates from 201448. In one project in Bulgaria49 and one in Romania50, the available information to consumers was dated 2015. For another project in Romania51, the information was not published at all, but only provided upon request. In this case, following the audit visit, the website of the water operator was updated and as of February 2017, data covering the year 2016 have been published.
A revision of the Drinking Water Directive has been included in the Commission Work programme for 2017
Commission reviews in 2003, 2008 and 2013 have resulted in a first revision of the DWD in October 2015
60The Commission reviews the Annexes of the Directive in the light of scientific and technical progress at least every five years and must make proposals for amendments, where necessary52. The first review took place in 2003. In the context of that review, the Commission organised a consultation with representatives of Ministries of Health or Environment, water associations and research groups which highlighted that microbiological surveillance should be given more attention since consumers suffer more from infections than from intoxications.
61In 2008, in the context of the second review, the Commission ordered an external study concerning possible revisions of the DWD53. This study recommended the inclusion of drinking water safety planning (DWSP) into the DWD. The concept of DWSP, introduced by the World Health Organisation (WHO) in 2004, consists of a comprehensive risk assessment and risk management approach that encompasses all steps in water supply from catchment to consumer54. The study was updated in 2010 with a focus on DWSP. Following these two studies, in November 2010, the Commission concluded that a legislative revision of the DWD was not necessary at that time.
62Starting from 2013, the Commission organised a series of meetings and workshops in relation to the implementation and possible revision of the DWD for the third review55. Based on this third review the Commission decided to revise the text of Annexes II and III of the DWD.
63The Directive revising Annexes II and III of the DWD was adopted in October 2015 and Member States need to transpose it into national legislation within a period of 24 months56. The new Annex II provides an option to perform drinking water monitoring in a more flexible way, provided a risk assessment is performed following the principle of the water safety plan approach laid down in the WHO Guidelines for Drinking Water Quality. This will allow focusing monitoring resources where they are most needed and, when the outcome of the risk assessment permits, a reduction of monitoring can be considered. The new Annex III provides for revised specifications for the analysis of parameters.
The Commission has identified the need for a further revision of the DWD to address additional shortcomings
64In December 2014, following the European Citizens’ Initiative Right2Water (see paragraph 19), and in the context of the regulatory fitness (REFIT) programme, the Commission launched a study on the DWD. This study aimed at supporting an evaluation of whether the DWD needed to be revised, and was published in May 201657.
65On the basis of this study, the Commission adopted in December 2016 a Staff working document which concluded that the DWD fulfilled its objectives of contributing to the protection of human health58. In parallel, it also identifies several areas for improvement, notably the need to:
- revise the parameters, to better consider safety planning and risk-based approach;
- reinforce the provisions in the DWD to ensure the availability of up-to-date information to consumers; and
- tackle the issue of materials in contact with drinking water.
In November 2015, the Commission launched a study on materials in contact with drinking water which was published in March 201759. Currently, an impact assessment is being carried out, which is also planned to be published by the end of 2017. It will assist the Commission in its revision of the DWD, which has been included in the Commission Work programme for 201760.
67In addition, in December 2015, the Commission has launched the ‘Drinking Water Parameter Cooperation Project’, implemented by the WHO Regional Office for Europe. The 18 month project will review and evaluate the latest evidence available in order to have a basis for proposing a revised list of parameters to be included in Annex I of the revised DWD61.
All ERDF/CF projects examined improved drinking water in the areas concerned, but water losses remain a common problem
68We examined nine ERDF/CF projects during this audit, three in each of the Member States visited, to assess the contribution provided by EU funded projects to the fulfilment of the DWD objectives. Figure 2 provides an overview of the examined projects. Additional information on each project is available in Annex V.
For these projects, we checked whether they were suitable options for improving access to good quality drinking water or for reducing water losses. Our assessment has been based on:
- a review of project documentation such as applications, grant agreements, final reports, laboratory protocols and other documents related to the project implementation; and
- interviews with water operators, project beneficiaries and managing authorities.
Project beneficiaries were municipalities or associations of municipalities or counties. All the projects in Bulgaria and Romania were mixed projects: in addition to drinking water, they also addressed issues concerning waste water, which was also a priority in both countries.
71Five of the nine projects examined were major projects. For these five projects, JASPERS62 (the common technical service established between the Commission, the European investment Bank and European Bank for Reconstruction and Development) was involved in the project preparation and provided independent advice to help the beneficiaries and the competent national administrations.
72For all projects examined we found that the situation before their implementation, including information on the quality of water, the population connected and the status of the supply network (such as the age of the infrastructure and the percentage of water losses), had been properly assessed and described in the grant application.
Overall, the completed ERDF/CF projects examined achieved most of their objectives, but were sometimes delayed
Projects’ achievements
73We checked the targets and indicators set for the completed ERDF/CF projects examined. We concluded that they achieved their main objectives of improving the water quality, increasing access to drinking water or of reducing water losses as set out in their respective cost-benefit analyses, feasibility studies, grant agreements or project applications (see Table 3).
Member State | Main objectives addressed by the projects examined | Main activities related to drinking water |
---|---|---|
Bulgaria | Improve water quality Reduce water losses |
Reconstruction of a water treatment plant and pumping stations (major project) and replacement of old pipelines. |
Hungary | Improve water quality | Rehabilitation of the water distribution network and development of new pumping stations, construction of a connection system between the existing distribution network and the new water production systems, construction of new wells to exploit new water bases and construction of new water treatment plants. |
Romania | Improve water quality Increase access to drinking water Reduce water losses |
Rehabilitation and construction of water treatment plants, construction of water wells and reservoirs, extension and rehabilitation of the distribution network. |
In Bulgaria, the treatment plant and pumping stations for the major project in Gabrovo were reconstructed (see Picture 4). Moreover, for all three projects, the network pipes were rehabilitated and operational permits were obtained.
In the case of Hungary, the results of the test runs showed an improvement in water quality for all three projects examined. However, two projects (Békés and Szekszárd) were not yet in operation at the time of the audit visit. Moreover, for one of the projects (Szekszárd) further investments will be needed for ensuring long-term compliance with the DWD. This was due to poor planning (see Box 5).
Box 5
Additional investments needed for one CF project in Hungary (Szekszárd)
The very low level of the Danube in recent years (medium water level of 124 cm in 2015 versus 150-250 cm in previous years) resulted in higher than normal concentrations of Iron and Manganese in raw water. This led to non-compliant samples for the parameter manganese and the concentration of iron close to the threshold in the drinking water provided. To ensure long-term compliance, the need for additional iron and manganese removal capacity emerged, which will be co-financed by the EU during the 2014-2020 period, through a project of HUF 876 million (2.8 million euro).
However, the water level in the Danube, which, according to the project operator led to this situation, is not uncommon and the additional investment could have been anticipated. Similar low levels had been already registered in 2003 and 201163.
In the case of Romania, of the three projects examined, the project in Cluj and Sălaj counties, which had the objectives of improving drinking water treatment and distribution, achieved its objectives and the one in Călărași only partially achieved them (see Box 6).
Box 6
Partial achievement of objectives in a Romanian project (Călărași)
One of the objectives of the projects was to reduce water losses to 19 %. The target for the performance indicator ‘Physical water losses’ was not achieved due to an underestimation of the water losses before the project. In fact, the estimates (34 %) referred only to water losses in the distribution network, and were based on 2006-2007 data when the metering system for water catchment, pumping and distribution was not in place and when not all the customers were metered.
At project completion (July 2016), water losses were reported to be around 56 %. At the end of 2016 water losses were reduced to less than 51 %. The value reported after the project represents the water losses in the whole water system, including abstraction and treatment. In addition, a second cause for the high value of water losses reported in the final report is the fact that a works contract, which was supposed to finish in March 2013, was concluded only in June 2016 because of insolvency of the company that was originally awarded the contract.
Concerning the objective of improving drinking water quality, the results of the tests done after the project’s implementation showed that the quality of water met the required standard in all but one of the municipalities (Lehliu), where, in 2015, the analyses for free residual chlorine and for ammonium reported values above the thresholds respectively in more than 9 % and nearly 17 % of the cases. According to the project beneficiary, these parameters have been exceeded during the summer (July, August), when the quantities of water treated for human consumption reached the plant’s maximum capacity and the pre-treatment dose for chlorine was not sufficient.
The third project, in the Constanța region, also achieved its output indicators concerning the rehabilitation or construction of the physical infrastructure64, but the fulfilment of the performance objectives will only be able to be verified when the part of the works funded under the 2014-2020 period will be completed in 2019 (see paragraph 79).
The project beneficiaries in Bulgaria were required to report at completion stage to their managing authorities on outputs and financial implementation of the projects, but not on project impacts. For example, water losses and disruption of service were the main problems concerning drinking water that the projects in Bulgaria were planned to solve. Nevertheless, there were no specific indicators concerning these two aspects in the grant agreements. Our audit could however confirm that all ERDF/CF projects examined contributed to a reduction of water losses and of service disruptions.
Delays in the implementation of the projects
79All the projects examined in Hungary and Romania finished later than planned. The Hungarian projects ended with a delay between six and eight months compared to the timeframe stipulated in the initial grant agreements. Two of three Romanian projects had a delay of more than 30 months. The third project, which was supposed to end in November 2015, was extended to the 2014-2020 programme period because of the insolvency of the entrepreneur and the forecasted completion date is now the end of 2019. The situation was appreciably better in Bulgaria where two of the projects were completed with a small delay of three months and the third one was finished on time.
Financial implementation of the projects
80In Hungary, only one of the projects examined respected the initial cost estimates. For the other two projects examined (Békés and Szekszárd), final costs were more than 20 % and 9 % higher than the total costs set in the grant agreement. In both cases, following a public procurement procedure, the increases were related to higher than estimated costs of construction. The managing authority accepted these cost increases and amended several times the grant agreement. This also led to corresponding increases in the EU funding.
81On the other hand, for the projects examined in Bulgaria and Romania, the final costs were significantly lower (between 19 % and 33 %) than the amount budgeted in the grant agreement. This was mainly due to savings in the public procurement procedures. In the case of one major project in Bulgaria (Gabrovo) the cost reduction resulted also from the revision of the scope of the project (see Box 7).
Box 7
Cost reduction in a major project in Bulgaria (Gabrovo)
The cost-benefit analysis, annexed to the project application, incorrectly assumed an increase in water consumption which would follow an increase of the population. In fact, however, the population decreased. Based on this incorrect assumption, the volumes of water needed, as well as the required investment for the water treatment plant were over-estimated in the proposal. During the implementation of the project, the project planning was adjusted to a more realistic demographic scenario and water consumption. This, along with savings from the public procurement procedures, resulted in a cost reduction of 33 %.
Losses in the drinking water supply system are still high
82Water losses consist mainly of water leaking from the system before it reaches the end consumer (technical or physical losses), and of water consumed without being properly billed, for example, through illegal connections or improper metering of consumption (commercial or apparent losses)65. While the former unnecessarily increases production costs (because more water than necessary must be produced), the latter means foregone revenues. Water losses are normally estimated on the basis of the balance of water inflows and outflows in the system.
83According to a 2015 World Bank study66, the average level of water loss in the EU in 2012 was about 34 %. Of the visited Member States, only Hungary reports a lower percentage (24 %). Romania reports water losses in the order of 40 % and Bulgaria over 60 % (see Figure 3). In all three Member States, water losses have actually increased from 2005 (or 2007 for Romania) to 2013. The increase in reported water losses, especially in Romania, is mainly due to the improvement of metering, which led to a more accurate measurement of leakages.
For the 2014-2020 period, the Commission identified, for the three visited countries, the need to increase the efficiency of water use, including the reduction of water losses67. In addition, the Commission published in 2015 an EU Reference document on Good Practices on Leakage Management, to help Member States overcome these issues and provide guidance for the design of policies to improve efficient water use by utilities throughout the EU68. For Bulgaria, the need to improve water management has also been stressed since 2012 in the Council’s country-specific recommendations69.
85In Hungary, the Association of Water Utilities carried out a benchmarking exercise in 2008 which concluded that average water losses in Hungary were around 15-17 % in 2008 (around 10-13 % for the best four performing service providers, and 40 % for the worst). During the 2007-2013 programme period, the reduction of water losses, to a level below 20 %, was one of the selection criteria for EU co-financed projects.
86In Romania, the water losses in the network are considered acceptable if they are below 15 % of the total quantity entered in the distribution system70. Rehabilitation or modernisation works, as appropriate, are compulsory if the water losses (from the abstraction to the user) are above 20 %. However, because of the limited funding in the 2007-2013 programme period, priority was given to increasing access to water and thus to the extension of the water network.
87In Bulgaria, water losses of 60 % are very high compared to other EU countries. Individual targets in terms of water losses have been set for each water operator to be achieved by 2021. There is also a national target of 49 % to be achieved by 202671. In addition, the 2014-2023 Strategy for water supply and sanitation set the target to be achieved at national level for water losses at 30 % by 203972.
88Table 4 shows the situation concerning water losses before and after the implementation of the projects examined. Concerning the nine ERDF/CF projects examined, all but one, resulted in a reduction of water losses (see paragraph 76 and Box 6). However, according to more recent information, water losses in this project have decreased since the project completion.
Member State | Projects | Water losses before the project | Targets | Water losses after the project |
---|---|---|---|---|
Bulgaria | Project 1 (Gabrovo)1 | 73 % | 39 % | 44 % |
Project 2 (Veliko Tarnovo)1 | 70 % (in the area of the project) | 20 % | 20 % (in the area of the project) | |
Project 3 (Panagyurishte)1 | 60 % (in the area of the project) | Not set | 44 % (in the area of the project) | |
Hungary | Project 1 (Békés) | 30 % | Not set | 28 % |
Project 2 (Szekszárd) | 13 % | Not set | 10.9 % | |
Project 3 (Gyömrő) | 8.8 % | Not set | 7.7 % | |
Romania | Project 11 (Călărași) | 34 % (in the distribution system) | 19 % | 50.4 % (for the whole system, including abstraction and treatment) |
Project 21 (Constanța) | 64 % | 45.2 % | 44 % | |
Project 31 (Cluj) | 42 % | 36 % | 36.9 % |
1These projects involved the refurbishment of only a part of the network whereas the data on water losses are only available for the entire network.
Significant funds in addition to EU co-financing is still needed to provide access to quality drinking water and to ensure that EU-funded investments can be adequately maintained
89We assessed whether the visited Member States identified the additional funding needs to ensure the supply of good quality drinking water to its citizens and the extent to which this can be provided from national public and private resources. In addition, we examined whether the cost-recovery principle was duly taken into consideration when setting water tariffs so that the existing infrastructure can be properly maintained.
The investment gap for the three visited Member States up to 2020 is estimated at 6 billion euro
90Financial support from the EU budget should not replace national public expenditure73. This means that sufficient national public and private resources must be available to ensure an adequate level of investments in the long run and to maintain the infrastructure already put in place thanks to EU funding since they are excluded from future EU financing.
91Moreover, the same expenditure can receive support from only one EU fund or instrument74. For drinking water projects, which are considered revenue generating, only eligible expenditure reduced by potential net revenue can be financed. The net revenue takes account of not only the cash in-flows but also cash out-flows, such as operating (including maintenance) costs and the replacement cost of the investment over a specific reference period.
92Overall, ERDF/CF allocations to drinking water related investments in the EU13 Member States had been about 4 billion euro in the 2007-2013 programme period and about 3.4 billion euro are planned for the 2014-2020 programme period. The ERDF/CF allocations to drinking water related projects in the three visited Member States for both the 2007-2013 and 2014-2020 programme periods amount to around 3.7 billion euro (Table 5).
Amounts in million euro | 2007-2013 | 2014-2020 | Total |
---|---|---|---|
Bulgaria | 166 | 145 | 311 |
Hungary | 529 | 216 | 745 |
Romania | 1 388 | 1 261 | 2 649 |
Total | 2 083 | 1 622 | 3 705 |
In 2014, Bulgaria adopted the 2014-2023 Strategy for water supply and sanitation75 with the aim of improving the quality of water services and achieving the EU environmental standards. According to this document, for the 2014-2023 period, the investment needs for drinking water (abstraction, treatment, transmission and distribution) have been estimated at about 2.5 billion euro (BGN 5.0 billion). In comparison, the EU funding allocated to drinking water related investments in Bulgaria for the 2014-2020 period amount to about 145 million euro. This indicates an investment gap of around 1 600 million euro76 in the case of Bulgaria until 2020.
94In Romania, to ensure compliance with quality standards and the deadlines of the DWD, the authorities adopted in 2004 an ‘Implementation Plan on the quality of water intended for human consumption’, identifying the necessary actions regarding the supply of drinking water and the related financial needs up to the end of 2015, which were estimated at 5.6 billion euro. This amount was later revised, in the Operational Programme ‘Large Infrastructures’ for 2014-2020, to 5.8 billion euro, on top of the investments already made during the 2007-2013 period (EU contribution of 1.38 billion euro). In comparison, the EU funds allocated to investments related to drinking water in Romania for the 2014-2020 period amount to about 1.26 billion euro. This indicates an investment gap of around 4 540 million euro in the case of Romania until 2020.
95Finally, although of a much lesser magnitude, in Hungary additional national or other resources will be needed to fulfil the needs for improving water quality. According to an evaluation carried out in 2013, the investment needs to improve water quality in Hungary up to 2020 were estimated between 415 million and 460 million euro (HUF 130 000 - 140 000 million) whereas the EU allocation for the 2014-2020 programme period amounts to 216 million euro (HUF 67 634 million)77. This indicates an investment gap of up to 244 million euro in the case of Hungary until 2020.
User fees are not sufficient to ensure the sustainability of the projects
96The financial sustainability of the provision of water services is ensured when the revenues from these services are sufficient to cover both operating and maintenance costs and to recover capital costs and thus allow investments to be renewed. This is the cost recovery principle.
97For both the 2000-2006 and 2007-2013 programme periods, Commission guidance proposes that water tariffs should cover at least operating and maintenance costs, as well as a significant part of the depreciation charge on assets78. Depreciation can be considered as a proxy of the cost needed to renew the infrastructure in the future.
98For the 2014-2020 programme period, the approval of operational programmes is subject to an ex ante conditionality on cost-recovery, where there must be an adequate contribution of the different water uses to the recovery of the costs of water services79. The definition of what is an adequate contribution is, however, at the Member States’ discretion.
99In Bulgaria, according to the 2014-2023 Strategy, in a large number of Bulgarian water companies, operating costs are not covered by the revenues generated from water tariffs, despite the increases in rates since 2008 (water supply tariffs increased by 16 % from 2008 to 2011, passing from 1.19 BGN/m3 to 1.38 BGN/m3). In fact, according to all scenarios developed in the strategy, the average combined tariffs for water and waste water would need to increase by 2024 to approximately the double of the tariffs in place in 2011 to achieve the objective of compliance and sustainability.
100The non-respect of the cost recovery principle carries a significant risk for the sustainability of EU co-financed infrastructures. For example, in Bulgaria, on average, more than 400 million euro (BGN 800 million) would be needed annually, just to maintain the length and average age of the network in the current condition. However, between 2007 and 2011 less than 100 million euro (BGN 200 million) have been invested on average each year80.
101At the same time, water services must be socially affordable for customers. Commission guidance81 refers to 4 % of household income as a commonly accepted affordability ratio, i.e. the total water bill (drinking water and waste water) can represent 4 % of household income. The principle of affordability is taken into account in the legislation of the three visited Member States. In Bulgaria, affordability is ensured when the invoice cost of the water services does not exceed 2.5 % of the average monthly income of a household in the district concerned82. In Romania, the recommended general affordability level for the water supply and sanitation is 3.5 % of the average monthly household income at national level (separate for urban and rural areas)83. Based on the information included in the project applications, tariffs had been set at approximately 2 % - 2.5 % of the net income of an average income household. Finally, in Hungary, although the principle of affordability is mentioned in the legislation84, no specific affordability rate has been defined.
102In Bulgaria and Romania, water supply tariffs are established by the water operator and endorsed by the regulator85. In both countries, national legislation provides that the tariffs should cover the costs of providing the service, ensure the effective and secure operation of the service, environmental conservation and protection, and public health, discourage excessive consumption and encourage capital investment, to ensure the respect of the operator’s financial autonomy and ensure continuity of the service86.
103In addition, in Romania, water operators implementing projects financed from EU funds are required to establish a reserve fund for maintenance, replacement and development for the whole period of investment. It should be supplied from the revenues of the water services and thus taken into account when establishing the tariffs87. However, two of the three projects examined did not take into consideration the reserve fund when determining these tariffs. According to the water operator of one of the projects examined (in Călărași), the inclusion of this fund in the tariff structure would have led to charges which would have been too high for the residential consumers to afford. This may result in sub-standard maintenance and the impossibility of replacing the installation in the longer term and put the sustainability of water infrastructure at risk.
104In Hungary, full cost-recovery is required and from 2012 onwards detailed requirements for tariff setting at national level are to be set by Decree of the Minister in charge88. The same legislation specified that for 2012 the tariffs could only be increased by a maximum of 4.2 % compared to the 2011 tariffs. A subsequent law of 201389 specified that the tariff should be decreased by 10 % compared to the 2012 tariffs as from July 2013. Since then, as no Decree for setting tariffs has yet been adopted, tariffs have remained unchanged.
105For the three projects examined in Hungary, the tariffs in place in 2016 were on average 15 % lower than those announced in the applications and used to assess the projects. This implies that cost-recovery may not be achieved and thus that the maintenance may not be carried out properly and there might not be enough reserves in place for the replacement of equipment in the long term and thus ensuring the sustainability of water infrastructures.
106Similar issues as regards the risk of revenues generated being insufficient to ensure the operation and maintenance of EU-funded infrastructure have already been highlighted in several of our previous reports90.
Conclusions and recommendations
107Overall, we found that citizens’ access to and supply of quality drinking water in Bulgaria, Hungary and Romania has improved. This is to a large extent due to the significant ERDF and CF investments made in recent years. Nevertheless, there are still areas where citizens are supplied with water from the public supply network that is not fully in compliance with the EU standards set out in the 1998 Drinking Water Directive. Moreover, significant further national public and private investments are and will be needed to ensure access to good quality water to all citizens in these Member States and to ensure that EU-funded investments in water facilities can be adequately maintained.
The 1998 Drinking Water Directive had been implemented in most respects by the end of 2016
108The Commission has closely monitored the compliance with the DWD’s requirements and where necessary has used infringement procedures in all the three Member States visited. A number of derogations were granted to Hungary and Romania at the time of their accession to the EU, and additional derogations were put in place by these Member States at a later stage. Member States must immediately inform the Commission of these derogations whenever they concern large water supply zones (LWSZ), but only from the second derogation in case of small water supply zones (SWSZ). By 2016, the national legislations in all three Member States visited were in compliance with the requirements of the Drinking Water Directive. Nevertheless, and despite the significant improvements in water quality in the three Member States visited in recent years, some citizens are still confronted with drinking water that does not meet all EU quality standards (see paragraphs 31 to 41).
109The reporting by Member States on the quality of water intended for human consumption, published every three years, is the main tool used by the Commission to detect non-compliance with the parametric values laid down in the DWD. We identified a number of shortcomings in the current monitoring arrangements. First, Member States are late in reporting data to the EEA based on which the Commission assesses the implementation of the DWD. For example, Hungary only provided its data for the 2011-2013 reporting period in April 2016, more than one year later than required. Second, the EEA (which checks monitoring compliance on behalf of the Commission) did not detect inconsistencies in the data for the 2011-2013 period reported by Member States. Third, in all the three visited Member States, we found that not all the parameters required under the DWD had been monitored, without any justifications or explanations about possible monitoring exceptions. This was also confirmed for some of the ERDF/CF projects examined where we noted that the monitoring was not carried out in accordance with the DWD and fewer parameters than required in the DWD had been tested. Finally, according to the DWD, reporting on SWSZ is not mandatory. The Commission does not have investigative powers and cannot check whether the monitoring takes place in accordance with the way it is reported. It is assumed that Member States report in good faith, in accordance with the principle for sincere cooperation (see paragraphs 42 to 56).
110Member States are required to take the measures necessary to ensure that adequate and up-to-date information on the quality of water intended for human consumption is available to consumers. In the three Member States visited, we found that this requirement had been correctly transposed in national legislation, but practices in making such information available to customers differ significantly and in general, up-to-date information on the water quality is not systematically provided to citizens. There is currently no Commission guidance on this aspect (see paragraphs 57 to 59).
111A revision of the Drinking Water Directive has been included in the Commission Work programme for 2017 to address a number of shortcomings identified by the Commission on the basis of the Member States’ reporting and scientific advice (see paragraphs 60 to 67).
Recommendation 1
The Commission should follow-up gaps in Member States’ monitoring based on existing reporting and enforce the requirements of the Drinking Water Directive in this respect.
Implementation date: by the end of 2018 (at the end of the current reporting period).
Recommendation 2
The Commission, in the context of the current revision of the DWD, should address the following issues in a proportionate manner:
- improving the provision of information from Member States to the Commission about derogations concerning SWSZ;
- the extension of the reporting requirements to SWSZ;
- regular reporting ensuring that up-to-date information on the compliance with the DWD is collected from Member States. The Commission should consider options such as alternative IT tools (e.g. data harvesting from national administrations) to facilitate the reporting exercise, make it swifter and to ensure availability of up-to-date information;
- improving the requirements for the provision of adequate and up-to-date information on the quality of water intended for human consumption available to consumers.
Implementation date: by the end of 2017.
All ERDF/CF projects examined improved drinking water in the areas concerned, but water losses remain a common problem
112Overall, the ERDF/CF projects examined achieved their main objectives of improving the water quality, increasing access to drinking water or of reducing water losses as set out in the grant agreement or the project application. All but one of the ERDF/CF projects examined were implemented according to the most-suitable option for fulfilling the identified needs. Moreover, the completed ERDF/CF projects examined achieved most of their objectives, but were sometimes delayed (in particular in Hungary and Romania). Costs higher than those initially budgeted were noted for two of the three projects examined in Hungary (see paragraphs 73 to 81).
113In 2012, the average level of water losses in Hungary was around 24 %, in Romania around 40 % and in Bulgaria over 60 %. This compares to an EU average of about 34 %. In all three Member States, the water losses have actually increased from 2005 (or 2007 for Romania) to 2013. The increase in reported water losses, especially in Romania, is linked to the improvement of metering, which led to a more accurate measurement of leakages. For Bulgaria, the need to improve water management has also been stressed since 2012 in the Council’s country-specific recommendations. Concerning the nine ERDF/CF projects examined, all but one, resulted in a reduction of water losses. However, according to more recent information, water losses in this project have decreased since the project completion. Overall, water losses, especially in Bulgaria and Romania, remain high and this impacts on the overall efficiency of the water system and increases costs for both consumers and society as a whole. During the 2007-2013 programme period, only Hungary had used the planned reduction of water losses as selection criteria for EU-funded projects (see paragraphs 82 to 88).
Recommendation 3
Member States should require that plans to reach a certain level of reduction of water losses are included as selection criteria for all water facility projects that allow the meeting of national targets.
Implementation date: by the end of 2017.
Recommendation 4
The Commission should support Member States in promoting actions aiming at the reduction of water losses. This could be achieved, for example, by including water loss reduction in the scope of EU funding in the field of drinking water infrastructure, or by enhancing transparency on water losses.
Implementation date: for the next programme period.
Significant funds in addition to EU co-financing still needed to provide access to quality drinking water and to ensure that EU-funded investments can be adequately maintained
114Sufficient national public and private resources must be available to ensure an adequate level of investments in the long run and to maintain the infrastructure put in place thanks to EU funding. Financial support from the EU budget should not replace public expenditure by a Member State. The ERDF/CF allocations to drinking water related projects in the three visited Member States for both the 2007-2013 and 2014-2020 programme period amount to around 3.7 billion euro. This means that overall, the visited Member States will be required to invest more than 6 billion euro to cover their estimated needs by the end of 2020. This indicates that not all of the needed investments in water facilities are likely to be made, in particular in Bulgaria and Romania (see paragraphs 90 to 95).
115The financial sustainability of the provision of water services is therefore only ensured when the revenues from these services are sufficient to cover both operating and maintenance costs and to recover capital costs and thus allow investments to be renewed. This is the cost recovery principle. At the same time, water services must be socially affordable to the customers. For the 2014-2020 programme period, the respect of the cost-recovery principle was made mandatory through the necessity to fulfil an ex ante conditionality. This means that the approval of operational programmes for the 2014-2020 programme period is subject to the existence of an adequate contribution of the different water uses to the recovery of the costs of water services. The definition of what is an adequate contribution is, however, at the Member States’ discretion. Overall, in none of the three Member States will the level of user fees be sufficient to cover the operational and maintenance cost of the drinking water facilities (see paragraphs 96 to 106).
Recommendation 5
Member States should:
- ensure that water tariffs provide for the sustainability of water infrastructure, including its maintenance and renewal;
- while ensuring the full cost-recovery in the water tariffs structure, consider, if necessary, granting financial or other forms of support to households for which the cost of water services is above the affordability rate.
Implementation date: immediately.
This Report was adopted by Chamber II, headed by Mrs Iliana IVANOVA, Member of the Court of Auditors, in Luxembourg at its meeting of 5 July 2017.
For the Court of Auditors
Klaus-Heiner LEHNE
President
Annexes
Annex I
ERDF/CF spending on the management and supply of drinking water (2007-2013 and 2014-2020 programme periods)
Annex II
Sources of drinking water in the EU
About 50 % of drinking water is taken from groundwater and about 40 % from surface water1. The remaining 10 % of drinking water is obtained from other sources, like artificial groundwater recharge2 or bank filtration water3.
The amounts of water abstracted (all water uses included) vary immensely among EU13 Member States ranging from 100 cubic metres per capita in Malta to 1 300 cubic metres per capita in Estonia (see Figure 1).
Supplying drinking water for domestic consumption accounts for less than a fifth of all water use4 (see Figure 2).
Annex III
Previous ECA reports and their main conclusions
Annex IV
Infringement procedures concerning the Drinking Water Directive in the visited Member States
Annex V
Overview of projects examined
1All the grant amounts are originally expressed in the national currencies. For the projects in Bulgaria, the amounts in euro have been calculated with the exchange the fixed exchange rate of 1.95583 BGN/euro. For the projects in Romania, the amounts in euro have been calculated with an average exchange rate between the Inforeuro exchange rate in place at the time of the projects approval and the Inforeuro exchange rate in place when the projects were completed. For the projects in Hungary, the amounts in euro have been calculated with the exchange rate of 313.12 HUF/euro that was the official exchange rate in place on 31.12.2015.
Abbreviations and Glossary
Audit monitoring: The purpose of audit monitoring is to provide the information necessary to determine whether or not all of the Drinking Water Directive’s parametric values are being complied with.
All the parameters set in accordance with Annex I of the Drinking Water Directive are subject to audit monitoring.
Check monitoring: The purpose of check monitoring is to determine whether water intended for human consumption complies with the relevant parametric values laid down in the Drinking Water Directive. It provides, on a regular basis, information on the organoleptic (i.e. colour, odour, and feel of a substance) and microbiological quality of the water supplied for human consumption as well as on the effectiveness of drinking-water treatment (particularly of disinfection) where it is used.
Only some parameters listed in the Drinking Water Directive are required to be included in the check monitoring.
Citizens’ initiative: A European citizens’ initiative is an invitation to the European Commission to propose legislation on matters where the EU has competence to legislate. A citizens’ initiative has to be backed by at least one million EU citizens, coming from at least seven out of the 28 Member States. A minimum number of signatories is required in each of those seven Member States. The rules and procedures governing the citizens’ initiative are set out in Regulation (EU) No 211/2011 of the European Parliament and of the Council of 16 February 2011 on the citizens’ initiative (OJ L 65, 11.3.2011, p. 1).
Cohesion Fund (CF): The Cohesion Fund aims at strengthening economic and social cohesion within the European Union by financing environment and transport projects in Member States with a per capita GNI of less than 90 % of the EU average.
Country-specific Recommendations (CSR): Country-specific recommendations (CSR) are recommendations relating to structural challenges which it is appropriate to address through multiannual investments that fall directly within the scope of the ESI Funds as set out in the Fund-specific Regulations. They are adopted by the Commission in accordance with Article 121(2) and Article 148(4) of the Treaty on the Functioning of the European Union (TFEU).
Drinking Water Directive (DWD): Council Directive 98/83/EC of 3 November 1998 on the quality of water intended for human consumption (OJ L 330, 5.12.1998, p. 32).
Drinking water safety planning (DWSP): The concept of DWSP was introduced by the World Health Organisation (WHO) in 2004. It consists of a comprehensive risk assessment and risk management approach that encompasses all steps in water supply from catchment to consumer.
Water operators and public health authorities should preferably develop a DWSP for each individual drinking water supply zone.
EU13: EU13 refers to the Member States who joined the EU in 2004 or later. These are: Bulgaria, the Czech Republic, Estonia, Croatia, Cyprus, Latvia, Lithuania, Hungary, Malta, Poland, Romania, Slovakia and Slovenia.
European Environment Agency (EEA): The EEA is an agency of the European Union.
It provides independent information on the environment for those involved in developing, adopting, implementing and evaluating environmental policy, and also for the general public. The EEA gathers data and produces assessments on a wide range of topics related to the environment.
European environment information and observation network (Eionet): The Eionet is a partnership network of the European Environment Agency (EEA) and its members and cooperating countries. It consists of the EEA itself, six European Topic Centres (ETCs) and a network of around 1 000 experts from 39 countries in up to 400 national bodies dealing with environmental information. Through Eionet, the EEA coordinates the delivery of environmental data from individual countries.
European Regional Development Fund (ERDF): The European Regional Development Fund aims at reinforcing economic and social cohesion within the European Union by redressing the main regional imbalances through financial support for the creation of infrastructure and productive job-creating investment, mainly for businesses.
Europe 2020 strategy: Europe 2020 strategy is the EU’s 10-year jobs and growth strategy. It was launched in 2010 to create the conditions for smart, sustainable and inclusive growth. It includes five headline targets covering employment, research and development, climate and energy, education, social inclusion and poverty reduction.
European Council of 17 June 2010, Conclusions further to COM(2010) 2020 final of 3 March 2010 ‘EUROPE 2020 A strategy for smart, sustainable and inclusive growth’.
Ex ante conditionalities: Ex ante conditionalities are conditions, based on pre-defined criteria established in partnership agreements, which are regarded as necessary prerequisites for the effective and efficient use of Union support covered by those agreements. When preparing ERDF, CF and ESF OPs under the 2014-2020 programme period, Member States have to assess whether these conditions are fulfilled. If they have not been fulfilled, action plans need to be prepared to ensure fulfilment by 31 December 2016.
Indicator parameter: Indicator parameters are a mixture of microbiological, chemical and radiological parameters providing information on treatment processes and the organoleptic quality of drinking water.
Joint Assistance to Support Projects in European Regions (JASPERS): JASPERS is a technical assistance partnership between three partners (European Commission, European investment Bank and European Bank for Reconstruction and Development). It provides independent advice to beneficiary countries to help prepare high quality major projects to be co-financed by two EU Structural and Investment Funds (European Regional Development Fund and Cohesion Fund).
Large Water Supply Zones (LWSZ): Large water supply zones are those supplying more than 1 000 m3 of water a day as an average or serving more than 5 000 persons.
Major project: A project which comprises an economically indivisible series of works fulfilling a precise technical function, having clearly identified aims and whose total cost assessed when determining the contribution of the funds exceeds 50 million euro and is generally a large-scale infrastructure project in transport, environment or other sectors such as culture, education, energy or ICT. Commission approval is required at overall project level.
For the 2014-2020 programme period, the threshold was raised to 75 million euro in the case of operations contributing to the thematic objective under point (7) of the first paragraph of Article 9 - ‘promoting sustainable transport and removing bottlenecks in key network infrastructures’.
Managing authority: A managing authority is a national, regional or local public authority (or any other public or private body), which has been designated by a Member State to manage an operational programme. Its tasks include selecting projects to be funded, monitoring how projects are implemented and reporting to the Commission on financial aspects and results achieved. The managing authority is also the body to impose financial corrections on beneficiaries following audits carried out by the Commission, European Court of Auditors or a relevant authority in a Member State.
Nonrevenue water: Nonrevenue water consists mainly of water leaking from the system before it reaches the end consumer (technical or physical losses), and of water consumed without being properly billed, for example, through illegal connections or improper metering of consumption (commercial or apparent losses). While the former unnecessarily increases production costs (because more water than necessary must be produced), the latter means foregone revenues. Nonrevenue water is normally estimated based on the establishment of a balance of water inflows and outflows in the system.
For simplification purposes, in this report the term ‘water losses’ will be used in place of ‘nonrevenue water’.
Operational programme (OP): An OP sets out a Member State’s priorities and specific objectives and describes how funding (EU and national public and private co-financing) will be used during a given period (currently seven years) to finance projects. The projects within an OP must contribute to a certain number of objectives. OP funding may come from the ERDF, CF and/or ESF. The OP is prepared by the Member State and has to be approved by the Commission before any payments can be made from the EU budget. OPs can only be modified during the programme period if both parties agree.
Programme period: The multi-annual framework within which ERDF, ESF and CF expenditure is planned and implemented.
Regulatory Fitness and Performance Programme (REFIT): Under REFIT, the Commission is screening the entire stock of EU legislation on an ongoing and systematic basis to identify burdens, inconsistencies and ineffective measures and identify corrective actions.
Small Water Supply Zones (SWSZ): Small water supply zones are those supplying below 1 000 m3 of water a day as an average or serving less than 5 000 persons.
TFEU: Treaty on the Functioning of the European Union.
Water supply zone (WSZ): A supply zone is a geographically defined area within which water intended for human consumption comes from one or more sources and within which water quality may be considered as being approximately uniform.
Endnotes
1 European Environment Agency, http://www.eea.europa.eu.
2 Council Directive 75/440/EEC of 16 June 1975 concerning the quality required of surface water intended for the abstraction of drinking water in the Member States (OJ L 194, 25.7.1975, p. 26).
3 Council Directive 80/778/EEC of 15 July 1980 relating to the quality of water intended for human consumption (OJ L 229, 30.8.1980, p. 11).
4 Council Directive 98/83/EC of 3 November 1998 on the quality of water intended for human consumption (OJ L 330, 5.12.1998, p. 32).
5 Article 7 and Annexes II and III of the DWD.
6 Article 13 of the DWD.
7 http://rod.eionet.europa.eu/obligations/171.
8 COM(2016) 666 final of 20.10.2016 ‘Synthesis Report on the Quality of Drinking Water in the Union examining Member States’ reports for the 2011-2013 period, foreseen under Article 13(5) of Directive 98/83/EC’.
9 COM(2014) 363 final of 16.6.2014 ‘Synthesis Report on the Quality of Drinking Water in the Union examining Member States’ reports for the 2008-2010 period, foreseen under Directive 98/83/EC’.
10 COM(2016) 666 final, p. 2.
11 Data extrapolated from the 2008-2010 fact sheets per Member State on Small Water Supply Zones, http://ec.europa.eu/environment/water/water-drink/reporting_en.html.
12 Decision No 1386/2013/EU of the European Parliament and of the Council of 20 November 2013 on a General Union Environment Action Programme to 2020 ‘Living well, within the limits of our planet’, Priority Objective 3, point 54 (iii) (OJ L 354, 28.12.2013, p. 171).
13 COM(2014) 363 final.
14 European Council of 17 June 2010, Conclusions further to COM(2010) 2020 final of 3 March 2010 ‘EUROPE 2020, A strategy for smart, sustainable and inclusive growth’.
15 Decision No 1386/2013/EU, Priority Objective 2, point 41.
16 The overall EU allocation for waste water projects during the 2007-2013 programme period was about 14.6 billion euro, out of which about 10 billion euro for the EU13 Member States. For 2014-2020 the allocation is about 10 billion euro, out of which 7 billion euro for the EU13 Member States.
17 Eurostat - Population connected to public water supply, code ten00012.
19 COM(2014) 177 final of 19.3.2014 Communication from the Commission on the European Citizens’ Initiative ‘Water and sanitation are a human right! Water is a public good, not a commodity!’.
20 Article 9 of Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 establishing a framework for Community action in the field of water policy (OJ L 327, 22.12.2000, p. 1).
21 European Commission, ‘The new programming period 2007-2013 - Guidance on the methodology for carrying out cost-benefit analyses - working document No 4’, 8/2006.
22 Special Report No 9/2010 ‘Is EU Structural measures spending on the supply of water for domestic consumption used to best effect?’; Special Report No 4/2014 ‘Integration of EU water policy objectives with the CAP: a partial success’; Special Report No 2/2015 ‘EU-funding of urban waste water treatment plants in the Danube river basin: further efforts needed in helping Member States to achieve EU waste water policy objectives’; Special Report No 23/2015 ‘Water quality in the Danube river basin: progress in implementing the water framework directive but still some way to go’; and Special Report No 3/2016 ‘Combating eutrophication in the Baltic Sea: further and more effective action needed’ (http://eca.europa.eu).
23 EPRS, Water legislation, Cost of Non-Europe Report, May 2015.
24 Special Report No 9/2010.
25 Article 291(1) of the Treaty on the Functioning of the European Union (TFEU).
26 Article 17 of the Treaty on European Union (TEU).
27 1st May 2004 for Hungary and 1st January 2007 for Bulgaria and Romania.
28 Infringement procedures 2008/2247 for Hungary, 2009/2259 for Bulgaria and 2009/2260 for Romania.
29 Annex VII Chapter 9 Environment, part C - Water quality (OJ L 157, 21.6.2005, p. 166-171).
30 For detailed information about pollution of water due to agricultural practices, refer to the Court’s Special Reports No 23/2015 and No 3/2016.
31 Development of a Concept for the Future of Reporting under the Drinking Water Directive - critical analysis report, May 2013.
32 http://rod.eionet.europa.eu/obligations/171/deliveries.
33 Note 4 to Table B1 of the DWD. These provisions will be replaced by the new Annex II of the DWD as modified by Commission Directive (EU) 2015/1787 (OJ L 260, 7.10.2015, p. 6), which must be transposed by Member States at the latest by October 2017.
34 Commission Directive (EU) 2015/1787 of 6 October 2015 amending Annexes II and III to Council Directive 98/83/EC on the quality of water intended for human consumption (OJ L 260, 7.10.2015, p. 6).
35 Arsenic, boron, cadmium, chromium, copper, mercury, nickel, lead, antimony and selenium.
36 On p. 102 of the Bulgarian National report on Environment for 2012.
37 Overview of the drinking water quality in Bulgaria, reporting 2011-2013 under DWD, p. 12.
38 Overview of the drinking water quality in Romania - Results of the reporting 2011-2013 under the Drinking Water Directive 98/83/EC.
39 Table 3-2.
40 Calitatea apei distribuite în sistem centralizat în zonele cu peste 5000 de locuitori sau cu un volum de distribuție de peste 1000mc/zi în anul 2013 (ZAP mari) – Raport sintetic, published on the website of the National Centre for Monitoring Community Environment Risks.
41 http://ec.europa.eu/environment/water/water-drink/reporting_en.html and http://ec.europa.eu/environment/water/water-drink/small_supplies_en.html.
42 COM(2016) 666 final, p. 2.
43 Article 4.3 of the Treaty on European Union.
44 Towards a Guidance Document for the implementation of a risk-assessment for small water supplies in the European Union, Overview of best practices. November 2011.
45 Small drinking water supplies: a ‘Framework for action’ to improve management - ISBN 978-92-79-44633-7 (http://ec.europa.eu/environment/water/water-drink/pdf/Small%20drinking%20water%20supplies.pdf).
46 Article 13 of the DWD.
47 Study supporting the revision of the EU Drinking Water Directive, Evaluation Report, Ecorys, May 2016.
48 In Hungary, the public is informed on the website of the National Public Health and Medical Officer Service (‘ÁNTSZ’) (www.antsz.hu) and on the website of the National Institute of Environmental Health (‘OKI’) (https://oki.antsz.hu). Websites consulted on 25 January 2017.
49 Project BG161PO005-1.0.06-0073-C0001, Municipality of Panagyurishte.
50 Project CCI 2007RO161PR003, Călărași county.
51 Project CCI 2009RO161PR005, Constanța region.
52 Article 11 of the DWD.
53 European Commission DG Environment, ‘Impact Assessment of possible Revisions to the Drinking Water Directive. Final report’, September 2008.
54 World Health Organisation, Guidelines for Drinking-water Quality, third edition, 2004 (www.who.int).
55 Informal expert group on the implementation of Directive 98/83/EC (Drinking Water Directive).
56 Commission Directive (EU) 2015/1787.
57 Study supporting the revision of the EU Drinking Water Directive, Evaluation Report, Ecorys, May 2016.
58 SWD(2016) 428 final, ‘Refit Evaluation of the Drinking Water Directive 98/83/EC’.
59 Support to the implementation and further development of the Drinking Water Directive (98/83/EC): Study on materials in contact with drinking water, March 2017.
60 COM(2016) 710 final of 25.10.2016 ‘Commission Work Programme 2017 - Delivering a Europe that protects, empowers and defends’.
61 Information note, WHO Regional office for Europe, CIRCABC.
62 JASPERS is a technical assistance partnership between three partners (the European Commission, the European investment Bank and the European Bank for Reconstruction and Development). It provides independent advice to beneficiary countries to help prepare high quality major projects to be co-financed by two EU Structural and Investment Funds (the European Regional Development Fund and the Cohesion Fund).
63 Hungarian Hydrological Forecasting Service (http://www.hydroinfo.hu).
64 Km of transmission and distribution pipes, rehabilitation or construction of wells, reservoirs, pumping stations and chlorination and treatment plants.
65 The technical term is ‘nonrevenue water’ as it is water that is not or cannot be billed. For simplification purposes and because water operators do not always provide details about the different types of nonrevenue water, we will use the term ‘water losses’ in all instances in this report.
66 Water and Waste water Services in the Danube region, May 2015 (http://sos.danubis.org/).
67 Country position papers for Bulgaria - Ref. Ares(2012)1273775 - 26/10/2012; Hungary - Ref. Ares(2012)1286381 - 30/10/2012; Romania - Ref. Ares(2012)1240252 - 19/10/2012.
68 Other CIS thematic documents ‘Good Practices on Leakage Management’, 2015, ISBN 978-92-79-45069-3 (http://ec.europa.eu/environment/water/water-framework/facts_figures/guidance_docs_en.htm).
69 Council recommendations 2012/C 219/03, 2013/C 217/03, 2014/C 247/02, 2015/C 272/08 and 2016/C 299/08.
70 Article 116 of the Annex to the order 88-2007 of the regulator.
71 Decision of the State regulator ПК-1/22.06.2016.
72 Strategy for Development and Management of the Water Supply and Sanitation Sector in the Republic of Bulgaria 2014-2023 (approved by Council of Ministers decision No 269 of May 7, 2014) (http://www.mrrb.government.bg/?controller=articles&id=5265).
73 Article 95(2) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council of 17 December 2013 laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006 (OJ L 347, 20.12.2013, p. 320).
74 Article 65(11) of Regulation (EU) No 1303/2013.
75 Strategy for Development and Management of the Water Supply and Sanitation Sector in the Republic of Bulgaria 2014-2023.
76 The need of 2 500 million euro is for 10 years, therefore the needs can be estimated at 250 million euro per year. For the seven years up to 2020, the needs can consequently be estimated at 1 750 million euro, from which to deduct the 145 million euro of EU funding.
77 Aspects of water and waste water improvements - final evaluation report No 101/2012 - ÖKO Zrt -Budapest, 2013 (Msz.: 101/2012. Ivóvíz és szennyvíz fejlesztések egyes kérdései - Értékelési zárójelentés ÖKO Zrt -Budapest, 2013. Március).
78 For the 2000-2006 programme period: Technical paper 1 - Application of the polluter pays principle - Differentiating the rates of Community assistance for Structural Funds, Cohesion Fund and ISPA infrastructure operations (6.12.99). For the 2007-2013 programme period: Guidance on the methodology for carrying out cost-benefit analyses, working document No 4, 8/2006.
79 Ex ante conditionality 6.1 of Regulation (EU) No 1303/2013.
80 Strategy for Development and Management of the Water Supply and Sanitation Sector in the Republic of Bulgaria 2014-2023.
81 European Commission, ‘The new programming period 2007-2013 - Guidance on the methodology for carrying out cost-benefit analyses - working document No 4’, 8/2006.
82 Additional provisions, paragraph 1, point 4 of the Law on the regulation of the water and sewerage services.
83 According to the National Strategy for the acceleration of development of the public utility community services, Approved by GD 246/2006.
84 Law CCIX on water utility services.
85 Energy and Water Regulatory Commission in Bulgaria and National Regulatory Authority for the Public Services of the Communal Management in Romania.
86 Ordinance regulating the quality of water and sewerage services in Bulgaria and Law 241/2006 in Romania.
87 Article 8(1) of the Annex to the ANRSC order No 65/2007 approving the methodology for the establishment, adjustment or modification of prices/tariffs for public services in the water supply and sanitation.
88 Law CCIX on water utility services.
89 Article 4 of Law LIV (2013) of 1.11.2013.
90 Special Reports No 9/2010 and No 2/2015.
1 European water policies and human health - EEA Report No 32/2016, page 18, http://www.eea.europa.eu/publications/public-health-and-environmental-protection.
2 Artificial recharge is the planned, human activity of augmenting the amount of groundwater available through works designed to increase the natural replenishment or percolation of surface waters into the groundwater aquifers.
3 Bank filtration is a type of filtration that works by passing water to be purified for use as drinking water through the banks of a river or lake. It is then drawn off by extraction wells some distance away from the water body.
4 Results and lessons from implementing the Water Assets Accounts in the EEA area - EEA, Technical Report No 7/2013 of 22 May 2013, p. 71.
1 http://ec.europa.eu/smart-regulation/guidelines/docs/swd_br_guidelines_en.pdf
2 SWD(2016) 428 final
3 SWD(2016) 428 final
4 http://ec.europa.eu/info/law/better-regulation/initiatives/ares-2017-1061434_en
5 http://ec.europa.eu/smart-regulation/guidelines/docs/swd_br_guidelines_en.pdf
Event | Date |
---|---|
Adoption of the Audit Planning Memorandum/Start of audit | 20.4.2016 |
Official sending of draft report to Commission (or other auditee) | 19.5.2017 |
Adoption of the final report after the adversarial procedure | 5.7.2017 |
Commission’s (or other auditee’s) official replies received in all languages | 11.8.2017 |
Audit team
The ECA’s special reports set out the results of its audits of EU policies and programmes or management topics related to specific budgetary areas. The ECA selects and designs these audit tasks to be of maximum impact by considering the risks to performance or compliance, the level of income or spending involved, forthcoming developments and political and public interest.
This performance audit was produced by Audit Chamber II – headed by ECA Member Iliana Ivanova - which specialises in investment for cohesion, growth and inclusion spending areas. The audit was led by ECA Member George Pufan, supported by Patrick Weldon, Head of Private Office and Mircea Radulescu, Attaché; Alain Vansilliette and Myriam Cazzaniga, Principal Managers; Paolo Pesce, Head of Task; Zuzana Gullova, Zhivka Kalaydzhieva, Attila Horvay-Kovács and Ana Popescu, Auditors.
Contact
EUROPEAN COURT OF AUDITORS
12, rue Alcide De Gasperi
1615 Luxembourg
LUXEMBOURG
Tel. +352 4398-1
Enquiries: eca.europa.eu/en/Pages/ContactForm.aspx
Website: eca.europa.eu
Twitter: @EUAuditors
More information on the European Union is available on the internet (http://europa.eu).
Luxembourg: Publications Office of the European Union, 2017
ISBN 978-92-872-7887-6 | ISSN 1977-5679 | doi:10.2865/920145 | QJ-AB-17-012-EN-N | |
HTML | ISBN 978-92-872-7895-1 | ISSN 1977-5679 | doi:10.2865/436817 | QJ-AB-17-012-EN-Q |
© European Union, 2017.
For any use or reproduction of photos or other material that is not under the European Union copyright, permission must be sought directly from the copyright holders.
HOW TO OBTAIN EU PUBLICATIONS
Free publications:
- one copy:
- via EU Bookshop (http://bookshop.europa.eu);
- more than one copy or posters/maps:
- from the European Union’s representations (http://ec.europa.eu/represent_en.htm);
- from the delegations in non-EU countries (http://eeas.europa.eu/delegations/index_en.htm);
- by contacting the Europe Direct service (http://europa.eu/europedirect/index_en.htm) or
- calling 00 800 6 7 8 9 10 11 (freephone number from anywhere in the EU) (*).
Priced publications:
- via EU Bookshop (http://bookshop.europa.eu).